hehe. I will be in Parker doing some minor training for when the Parker boys take on the D-row crew. http://www.riverratlife.com/forums/b...s/beerchug.gif http://www.riverratlife.com/forums/b.../alcoholic.gif
Really rigging blendaz is not that bad. The only thing that really takes time is to install the brackets and hand the motors. Should be able to get that done in a day. After that, it is just to hook up the engines. If that is all that needs to be done, 2 good guys on the boat and it should be able to be done in 2 days.