First, go get a license.$$$
Second, go get a permit.$$$
Third, get a preliminary inspection from the local inspector.$$$
Fourth, get a preliminary inspection from the county inspector.$$$
Fifth, wire it up in 5 minutes.
Sixth, get the post inspection from the local inspector.$$$
Seventh, get the post inspection from the county inspector.$$$
Eighth, call Uncle Tony and tell him you can now see the light!!!