Some other stuff that was going on over the winter.
I wanted as little wiring and periphials as possible to be seen, all the battery cable was replace with #2 gauge throughout, and was run behind all the panels
A shot of the Perko switch and Magnetic circuit breakers. Panel is 1/8" aluminum plate, polished. It's mounted on the back side of the seat base.
http://www.***boat.com/image_center/...ts_036-med.jpg
The back side of the panel... The cables exit the bench on the right of the photo, then are routed under the floor, bundled in a nylon sleeve.....
http://www.***boat.com/image_center/...ts_011-med.jpg
The cables exit the floor, through PVC fittings, between batteries 1 & 2 where they are routed to their proper locations.
http://www.***boat.com/image_center/...ts_033-med.jpg
The end is a clean uncluttered area for the batteries. (the two cables seen have since been routed together....)
http://www.***boat.com/image_center/...ts_034-med.jpg
A new fuel fill tube was fabbed from stainless, it replaces the old black hose, and looks a little better as well. In the foreground of the picture is the aluminum frame that holds the Coleman stainless ice chest in place.
http://www.***boat.com/image_center/...l_tube-med.jpg